Pier Pavilion at Barangaroo, with its ring of white columns and sandstone seating

Case Study: Pier Pavilion at Barangaroo

A complex CLT roof structure in a busy location presented NeXTimber with an interesting set of challenges to tackle.

 

Image credit: Rory Gardiner.

LOCATION
Barangaroo, Darling Harbour, NSW
ARCHITECT

Besley & Spresser

BUILDER
Stephen Edwards Construction (SEC)
ENGINEER
Northrop Structural Engineers

THE BRIEF

NeXTimber was engaged to support Stephen Edwards Construction (SEC) with the supply of CLT for the unique project located on Barangaroo Harbour.

Aerial view of the Pier Pavilion’s green roof on the Barangaroo foreshore, Sydney Harbour

Image credit: Rory Gardiner 

Underside of the CLT roof panels on the pavilion’s steel frame during construction
Image credit: Images for Business

THE PROCESS

NeXTimber supported SEC, the consultant team and the installers to develop a detailed and coordinated BIM of the structure. 

This required several design iterations balancing design, manufacturing and installation; factoring cost and time.

NeXTimber converted the design model, manufactured the complex panels and managed the challenging logistics into the heart of Sydney CBD for a successful delivery and installation. 

CLT roof panel being craned into the circular steel frame of the pavilion

CHALLENGES & SOLUTIONS

With this project being a Design & Construct (D&C) contract, the design still required significant design resolution before it was suitable to commence production.

Design coordination between parties (builder, engineers, installers, NeXTimber® and the steel fabricator) was critical to resolve interfaces given the intricate geometry and complex connections between steel structure and CLT, further challenged by the critical timeline and fabrication of the steel structure dictated.

The design team opted for using NeXTimber® CLT manufactured using H3 treated feedstock and pre-fitted temporary construction membrane.

 

The complex geometry of the CLT panels involved intricate CNC processing, and the delicate panel shapes required novel temporary strengthening and careful handling for safe transport and installation.

The irregular and oversized (up to 3.5m wide) panels required a careful transportation plan, and delivery times were limited given the central Sydney CBD site.

INSTALLATION

The delicate, irregular shaped panels required temp bracing through lifting and the complex geometry and connection detailing required accurate manufacturing and sequence planning. In addition, pre-installed CLT packers were required in some locations to allow for connection to the steel sub structure. 

Image credit: Rory Gardiner
Pier Pavilion at Barangaroo, with its ring of white columns and sandstone seating