<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" version="2.0">
  <channel>
    <title>NeXTimber Blog</title>
    <link>https://www.nextimber.com.au/news-articles</link>
    <description>NeXTimber CLT &amp; GLT News</description>
    <language>en</language>
    <pubDate>Thu, 26 Nov 2026 23:00:08 GMT</pubDate>
    <dc:date>2026-11-26T23:00:08Z</dc:date>
    <dc:language>en</dc:language>
    <item>
      <title>Powering the Shift to Electric: New CLT and Glulam Battery Charging Facility at Tarpeena</title>
      <link>https://www.nextimber.com.au/news-articles/powering-the-shift-to-electric-new-battery-charging-facility-at-tarpeena/</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/powering-the-shift-to-electric-new-battery-charging-facility-at-tarpeena/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/eb50568c-19c7-4e36-8ca0-309ca2977688.jpeg" alt="Powering the Shift to Electric: New CLT and Glulam Battery Charging Facility at Tarpeena" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;span class="hs_cos_wrapper hs_cos_wrapper_widget hs_cos_wrapper_type_module" style=""&gt;&lt;/span&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/powering-the-shift-to-electric-new-battery-charging-facility-at-tarpeena/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/eb50568c-19c7-4e36-8ca0-309ca2977688.jpeg" alt="Powering the Shift to Electric: New CLT and Glulam Battery Charging Facility at Tarpeena" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;span class="hs_cos_wrapper hs_cos_wrapper_widget hs_cos_wrapper_type_module" style=""&gt;&lt;/span&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=7954825&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fwww.nextimber.com.au%2Fnews-articles%2Fpowering-the-shift-to-electric-new-battery-charging-facility-at-tarpeena%2F&amp;amp;bu=https%253A%252F%252Fwww.nextimber.com.au%252Fnews-articles&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Articles</category>
      <pubDate>Tue, 21 Apr 2026 04:30:00 GMT</pubDate>
      <guid>https://www.nextimber.com.au/news-articles/powering-the-shift-to-electric-new-battery-charging-facility-at-tarpeena/</guid>
      <dc:date>2026-04-21T04:30:00Z</dc:date>
      <dc:creator>NeXTimber</dc:creator>
    </item>
    <item>
      <title>Tonsley ‘Factory of the Future’ Opening</title>
      <link>https://www.nextimber.com.au/news-articles/tonsley-factory-of-the-future-opening</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/tonsley-factory-of-the-future-opening" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/EDM%20Assets/Tonsley-Technical-Opening.jpeg" alt="Tonsley ‘Factory of the Future’ Opening" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;It was a milestone moment for mass timber in Australia as Tonsley Technical College officially opened recently. The building features NeXTimber® cross laminated timber (CLT) manufactured locally at our Tarpeena, South Australia facility. Purpose‑built to train the next generation of technicians, tradespeople and innovators, the College demonstrates the benefits of engineered timber in modern construction.&lt;br&gt;&lt;br&gt;We were proud to have Simon Angove, Chief Sales &amp;amp; Marketing Officer, and Jeremy Church, General Manager – NeXTimber, attend the opening, showcasing the importance of mass timber and supporting local manufacturing, regional jobs and responsibly sourced Australian timber.&lt;br&gt;&lt;span style="font-size: 12px;"&gt;Timberlink’s Simon Angove, South Australian Premier Peter Malinauskas and Timberlink’s Jeremy Church at the opening.&lt;/span&gt;&lt;br&gt;&lt;br&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/tonsley-factory-of-the-future-opening" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/EDM%20Assets/Tonsley-Technical-Opening.jpeg" alt="Tonsley ‘Factory of the Future’ Opening" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;It was a milestone moment for mass timber in Australia as Tonsley Technical College officially opened recently. The building features NeXTimber® cross laminated timber (CLT) manufactured locally at our Tarpeena, South Australia facility. Purpose‑built to train the next generation of technicians, tradespeople and innovators, the College demonstrates the benefits of engineered timber in modern construction.&lt;br&gt;&lt;br&gt;We were proud to have Simon Angove, Chief Sales &amp;amp; Marketing Officer, and Jeremy Church, General Manager – NeXTimber, attend the opening, showcasing the importance of mass timber and supporting local manufacturing, regional jobs and responsibly sourced Australian timber.&lt;br&gt;&lt;span style="font-size: 12px;"&gt;Timberlink’s Simon Angove, South Australian Premier Peter Malinauskas and Timberlink’s Jeremy Church at the opening.&lt;/span&gt;&lt;br&gt;&lt;br&gt;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=7954825&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fwww.nextimber.com.au%2Fnews-articles%2Ftonsley-factory-of-the-future-opening&amp;amp;bu=https%253A%252F%252Fwww.nextimber.com.au%252Fnews-articles&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Mon, 20 Apr 2026 23:00:00 GMT</pubDate>
      <guid>https://www.nextimber.com.au/news-articles/tonsley-factory-of-the-future-opening</guid>
      <dc:date>2026-04-20T23:00:00Z</dc:date>
      <dc:creator>NeXTimber</dc:creator>
    </item>
    <item>
      <title>Mt Gambier Technical College Opening</title>
      <link>https://www.nextimber.com.au/news-articles/mt-gambier-technical-college-opening/</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/mt-gambier-technical-college-opening/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/EDM%20Assets/Mt%20Gambier%20Technical%20College%20Opening.jpg" alt="Mt Gambier Technical College Opening" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;The Limestone Coast Technical College in Mount Gambier has officially opened, marking a significant milestone for education and skills development in regional South Australia.&lt;br&gt;&lt;br&gt;Delivered for the South Australian Government’s Department for Education, the new facility has been constructed using NeXTimber® Cross Laminated Timber (CLT) and Glue Laminated&lt;br&gt;Timber (GLT) for the building’s main structure. The college provides purpose‑built learning environments for students, with specialist pathways across agri‑tech, multi‑trades, early&lt;br&gt;childhood education, and health and social support.&lt;br&gt;&lt;br&gt;NeXTimber worked closely with the project team to develop a mass timber solution that balanced architectural intent, performance requirements and buildability, demonstrating the capability of&lt;br&gt;locally grown and locally manufactured timber in large‑scale education projects.&lt;br&gt;&lt;br&gt;Beyond material supply, Timberlink’s partnership with the Limestone Coast Technical College reflects a broader commitment to the region, supporting agri‑tech and multi‑trades programs&lt;br&gt;through site tours, work experience opportunities and potential employment pathways for students.&lt;br&gt;&lt;br&gt;The opening of the college represents an important investment in future skills, sustainable construction, and long‑term opportunities for the Limestone Coast community.&lt;br&gt;&lt;br&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/mt-gambier-technical-college-opening/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/EDM%20Assets/Mt%20Gambier%20Technical%20College%20Opening.jpg" alt="Mt Gambier Technical College Opening" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;The Limestone Coast Technical College in Mount Gambier has officially opened, marking a significant milestone for education and skills development in regional South Australia.&lt;br&gt;&lt;br&gt;Delivered for the South Australian Government’s Department for Education, the new facility has been constructed using NeXTimber® Cross Laminated Timber (CLT) and Glue Laminated&lt;br&gt;Timber (GLT) for the building’s main structure. The college provides purpose‑built learning environments for students, with specialist pathways across agri‑tech, multi‑trades, early&lt;br&gt;childhood education, and health and social support.&lt;br&gt;&lt;br&gt;NeXTimber worked closely with the project team to develop a mass timber solution that balanced architectural intent, performance requirements and buildability, demonstrating the capability of&lt;br&gt;locally grown and locally manufactured timber in large‑scale education projects.&lt;br&gt;&lt;br&gt;Beyond material supply, Timberlink’s partnership with the Limestone Coast Technical College reflects a broader commitment to the region, supporting agri‑tech and multi‑trades programs&lt;br&gt;through site tours, work experience opportunities and potential employment pathways for students.&lt;br&gt;&lt;br&gt;The opening of the college represents an important investment in future skills, sustainable construction, and long‑term opportunities for the Limestone Coast community.&lt;br&gt;&lt;br&gt;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=7954825&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fwww.nextimber.com.au%2Fnews-articles%2Fmt-gambier-technical-college-opening%2F&amp;amp;bu=https%253A%252F%252Fwww.nextimber.com.au%252Fnews-articles&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Mon, 20 Apr 2026 14:00:00 GMT</pubDate>
      <guid>https://www.nextimber.com.au/news-articles/mt-gambier-technical-college-opening/</guid>
      <dc:date>2026-04-20T14:00:00Z</dc:date>
      <dc:creator>NeXTimber</dc:creator>
    </item>
    <item>
      <title>Updates to NeXTimber Domestic GLT Range</title>
      <link>https://www.nextimber.com.au/news-articles/updates-to-domestic-glt-range/</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/updates-to-domestic-glt-range/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/NeXTimber-23-Lowres.jpg" alt="Updates to NeXTimber Domestic GLT Range" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;We are pleased to announce some important changes to our standard range of NeXTimber domestic Glue Laminated Timber (GLT). In order to better support our customers, we have consolidated the product range, moving from 300mm increments to 600mm increments.&lt;br&gt;&lt;br&gt;We are also stocking more of our frequently ordered sections in our distribution centers located in Victoria, South Australia and Western Australia. Profiles outside of this range can still be custom ordered by contacting your account manager.&lt;br&gt;&lt;br&gt;Our production cycle is now weekly, with the cutoff for orders closing at 12pm on Wednesdays to make ordering easier for our customers.&lt;br&gt;&lt;br&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/updates-to-domestic-glt-range/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/NeXTimber-23-Lowres.jpg" alt="Updates to NeXTimber Domestic GLT Range" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;We are pleased to announce some important changes to our standard range of NeXTimber domestic Glue Laminated Timber (GLT). In order to better support our customers, we have consolidated the product range, moving from 300mm increments to 600mm increments.&lt;br&gt;&lt;br&gt;We are also stocking more of our frequently ordered sections in our distribution centers located in Victoria, South Australia and Western Australia. Profiles outside of this range can still be custom ordered by contacting your account manager.&lt;br&gt;&lt;br&gt;Our production cycle is now weekly, with the cutoff for orders closing at 12pm on Wednesdays to make ordering easier for our customers.&lt;br&gt;&lt;br&gt;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=7954825&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fwww.nextimber.com.au%2Fnews-articles%2Fupdates-to-domestic-glt-range%2F&amp;amp;bu=https%253A%252F%252Fwww.nextimber.com.au%252Fnews-articles&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Articles</category>
      <pubDate>Thu, 11 Sep 2025 01:45:00 GMT</pubDate>
      <guid>https://www.nextimber.com.au/news-articles/updates-to-domestic-glt-range/</guid>
      <dc:date>2025-09-11T01:45:00Z</dc:date>
      <dc:creator>NeXTimber</dc:creator>
    </item>
    <item>
      <title>NeXTimber® Project in Adelaide Tops Out</title>
      <link>https://www.nextimber.com.au/news-articles/nextimber-project-in-adelaide-tops-out/</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/nextimber-project-in-adelaide-tops-out/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/Blog%20Images/Tonsley%20Project%20Tops%20Out.jpg" alt="NeXTimber® Project in Adelaide Tops Out" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;NeXTimber by Timberlink is pleased to announce it has supplied Cross Laminated Timber (CLT) panels for the roofs and floors of the Flinders University Factory of the Future and Tonsley Technical College project, located in South Australia.&lt;br&gt;&lt;br&gt;Flinders University Factory of the Future is an innovation centre for research and manufacturing, while the Tonsley Technical College is a TAFE college for training in building and construction, advanced manufacturing and engineering, and automotive and energy.&lt;br&gt;&lt;br&gt;The building is comprised of nearly 200 individual CLT panels which were delivered in 22 truckloads. All NeXTimber CLT used in the project is manufactured from Timberlink timber, sourced from responsibly managed Australian pine plantations.&lt;br&gt;&lt;br&gt;NeXTimber GM Technical and Sales, Jeremy Church, said “CLT is an engineered wood product comprising layers of solid structural timber boards, which are glued together, alternating the direction of each layer. This creates a strong and robust panel up to 16m long and 3.5m wide. CLT panels can be used to construct solid floors, walls, roofs and stairs in residential, commercial and industrial applications. The number of layers and the thickness can be customised to suit structural requirements, but will generally consist of three, five, seven or nine layers.”&lt;br&gt;&lt;br&gt;“NeXTimber CLT is supported with dual sustainability credentials and offers an exciting alternative to traditional construction materials which can help to reduce the embodied carbon of a project.”&lt;br&gt;&lt;br&gt;“This project is an excellent example of State Government investment in technology, innovation and sustainability. There is a real buzz around our offices and manufacturing facilities, knowing that we are part of this project.”&lt;br&gt;&lt;br&gt;NeXTimber prepared the draft documentation based on the technical information provided by the customer including 3D modelling of the CLT structure, the loading drawings, shop drawings of the individual CLT panels and the assembly sequence drawings.&lt;br&gt;&lt;br&gt;On Friday 20 September, representatives from the NeXTimber team were thrilled to attend the official topping out ceremony on site. This tradition marks the placement of the final structural element at a building’s highest point. In keeping with the ethos of the project, an innovative, bespoke tree, crafted by NeXTimber, was placed at the top to honour the tradition.&lt;br&gt;&lt;br&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/nextimber-project-in-adelaide-tops-out/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/Blog%20Images/Tonsley%20Project%20Tops%20Out.jpg" alt="NeXTimber® Project in Adelaide Tops Out" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;NeXTimber by Timberlink is pleased to announce it has supplied Cross Laminated Timber (CLT) panels for the roofs and floors of the Flinders University Factory of the Future and Tonsley Technical College project, located in South Australia.&lt;br&gt;&lt;br&gt;Flinders University Factory of the Future is an innovation centre for research and manufacturing, while the Tonsley Technical College is a TAFE college for training in building and construction, advanced manufacturing and engineering, and automotive and energy.&lt;br&gt;&lt;br&gt;The building is comprised of nearly 200 individual CLT panels which were delivered in 22 truckloads. All NeXTimber CLT used in the project is manufactured from Timberlink timber, sourced from responsibly managed Australian pine plantations.&lt;br&gt;&lt;br&gt;NeXTimber GM Technical and Sales, Jeremy Church, said “CLT is an engineered wood product comprising layers of solid structural timber boards, which are glued together, alternating the direction of each layer. This creates a strong and robust panel up to 16m long and 3.5m wide. CLT panels can be used to construct solid floors, walls, roofs and stairs in residential, commercial and industrial applications. The number of layers and the thickness can be customised to suit structural requirements, but will generally consist of three, five, seven or nine layers.”&lt;br&gt;&lt;br&gt;“NeXTimber CLT is supported with dual sustainability credentials and offers an exciting alternative to traditional construction materials which can help to reduce the embodied carbon of a project.”&lt;br&gt;&lt;br&gt;“This project is an excellent example of State Government investment in technology, innovation and sustainability. There is a real buzz around our offices and manufacturing facilities, knowing that we are part of this project.”&lt;br&gt;&lt;br&gt;NeXTimber prepared the draft documentation based on the technical information provided by the customer including 3D modelling of the CLT structure, the loading drawings, shop drawings of the individual CLT panels and the assembly sequence drawings.&lt;br&gt;&lt;br&gt;On Friday 20 September, representatives from the NeXTimber team were thrilled to attend the official topping out ceremony on site. This tradition marks the placement of the final structural element at a building’s highest point. In keeping with the ethos of the project, an innovative, bespoke tree, crafted by NeXTimber, was placed at the top to honour the tradition.&lt;br&gt;&lt;br&gt;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=7954825&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fwww.nextimber.com.au%2Fnews-articles%2Fnextimber-project-in-adelaide-tops-out%2F&amp;amp;bu=https%253A%252F%252Fwww.nextimber.com.au%252Fnews-articles&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Wed, 05 Feb 2025 02:00:00 GMT</pubDate>
      <guid>https://www.nextimber.com.au/news-articles/nextimber-project-in-adelaide-tops-out/</guid>
      <dc:date>2025-02-05T02:00:00Z</dc:date>
      <dc:creator>NeXTimber</dc:creator>
    </item>
    <item>
      <title>Premier of South Australia officially opens NeXTimber Cross Laminated Timber and Glue Laminated Timber facility and Timberlink Tarpeena green mill upgrade</title>
      <link>https://www.nextimber.com.au/news-articles/sa-premier-officially-opens-nextimber-facility/</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/sa-premier-officially-opens-nextimber-facility/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/Blog%20Images/NeXTimber-by-Timberlink-Mass-Timber-Tour.jpg" alt="Premier of South Australia officially opens NeXTimber Cross Laminated Timber and Glue Laminated Timber facility and Timberlink Tarpeena green mill upgrade" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Timberlink is pleased to announce the official opening of its NeXTimber® by Timberlink® &amp;nbsp;manufacturing facility and upgraded green mill located in Tarpeena, South Australia.&lt;br&gt;&lt;br&gt;The February 29 launch event was attended by over 300 people, including South Australian Premier the Hon. Peter Malinauskas MP, Minister for Primary Industries, Regional Development and Forest Industries the Hon. Clare Scriven, MLC, District Council of Grant Mayor Kylie Boston, District Council of Grant CEO Darryl Whicker, Member for Mackillop, Nick McBride and CEO of the South Australian Forest Products Association, Nathan Paine.&lt;br&gt;&lt;br&gt;Premier Peter Malinauskas said “this unique facility in South Australia’s Limestone Coast presents tremendous opportunities for value adding, product diversification and market expansion for the state’s $1.4 billion forest industries as well as the ability to contribute to the construction of taller and more complex timber buildings.&lt;br&gt;&lt;br&gt;“I congratulate the Timberlink team, and everyone involved in delivering this project which will have significant flow on benefits for the Limestone Coast economy and that of the whole state.&lt;br&gt;&lt;br&gt;“The State Government is committed to a smart, sustainable and inclusive economic path for increase resilience and competitiveness for our forest industries and is why we were pleased to contribute $2 million of funding towards this new state of the art facility.”&lt;br&gt;&lt;br&gt;The newly commissioned NeXTimber facility is Australia’s only combined CLT and GLT (Cross Laminated and Glue Laminated Timber) radiata pine mass timber facility, and the first in Australia to be integrated with a structural timber manufacturing plant. The NeXTimber facility can produce CLT panels up to 16M long and 3.5M wide, and GLT beams up to 12M long. Mass timber products offer an exciting alternative to traditional construction materials and can help to reduce the embodied carbon of a project. These timber structures can be built up to 12 stories and even taller when combined with other materials in a hybrid timber construction.&lt;br&gt;&lt;br&gt;Timberlink’s $70M capital investment to build a mass timber production facility was announced in 2020, supported by a $2M grant awarded by the SA government under the Strategic Business Round 2020 of the Government of South Australia’s Regional Growth Fund. The NeXTimber brand was announced in 2021 with the tagline “It’s what better tomorrows are built on.” Ground was broken with the first sod turn in Tarpeena in 2022 and construction of the site continued until late 2023. The facility has been taking orders since November 2023, a testament to the hard work of many. The NeXTimber facility has created new jobs not only during the construction phase, but on an ongoing basis with over 30 new full-time positions.&lt;br&gt;&lt;br&gt;Minister Clare Scriven said “South Australia’s forest industries have a long and proud history of sustainably growing and utilising our local resources to address the growing demands for timber, both domestically and internationally.&lt;br&gt;&lt;br&gt;“This new facility at Tarpeena continues that tradition of innovation, both by showcasing some of the world’s best new innovations and supporting greener, secure and modern employment opportunities, all critical ingredients towards ensuring Limestone Coast communities continue to thrive.&lt;br&gt;&lt;br&gt;“This initiative, which the State Government is proud to support, links in with other government commitments to the industry including a $15 million investment towards the establishment of the Forestry Centre of Excellence in Mount Gambier, the $2.346 million upgrade of the South East fire tower network including the installation of ground breaking artificial intelligence based bushfire detection and monitoring system and the $2 million contribution to assist the rollout of projects identified in the South Australian Wood Fibre and Timber Industry Master Plan.&lt;br&gt;&lt;br&gt;“It certainly is an exciting time for the Limestone Coast and South Australian Forest industries as a whole.”&lt;br&gt;&lt;br&gt;Timberlink’s NeXTimber facility development followed their 2019 announcement of a major timber manufacturing upgrade, with over $90M invested over the following 3 years, installing a new saw line, stacker and edger, contraflow kiln and batch kiln and drying building. This project created over 200 jobs in the construction phase.&lt;br&gt;&lt;br&gt;Timberlink Chief Sales, Marketing &amp;amp; Corporate Affairs Officer David Oliver said “This upgrade to the Tarpeena green mill is a testament to Timberlink’s commitment to innovation through timber manufacturing. By increasing the amount of timber that we can process here in the Limestone Coast region, we are directly supporting the local economy and jobs in the region.”&lt;br&gt;&lt;br&gt;Timberlink CEO Paul O’Keefe said “We are well positioned to play our part in supporting the Australian government’s COP28 commitment to increase the use of timber in the built environment by 2030.” &lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/sa-premier-officially-opens-nextimber-facility/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/Blog%20Images/NeXTimber-by-Timberlink-Mass-Timber-Tour.jpg" alt="Premier of South Australia officially opens NeXTimber Cross Laminated Timber and Glue Laminated Timber facility and Timberlink Tarpeena green mill upgrade" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Timberlink is pleased to announce the official opening of its NeXTimber® by Timberlink® &amp;nbsp;manufacturing facility and upgraded green mill located in Tarpeena, South Australia.&lt;br&gt;&lt;br&gt;The February 29 launch event was attended by over 300 people, including South Australian Premier the Hon. Peter Malinauskas MP, Minister for Primary Industries, Regional Development and Forest Industries the Hon. Clare Scriven, MLC, District Council of Grant Mayor Kylie Boston, District Council of Grant CEO Darryl Whicker, Member for Mackillop, Nick McBride and CEO of the South Australian Forest Products Association, Nathan Paine.&lt;br&gt;&lt;br&gt;Premier Peter Malinauskas said “this unique facility in South Australia’s Limestone Coast presents tremendous opportunities for value adding, product diversification and market expansion for the state’s $1.4 billion forest industries as well as the ability to contribute to the construction of taller and more complex timber buildings.&lt;br&gt;&lt;br&gt;“I congratulate the Timberlink team, and everyone involved in delivering this project which will have significant flow on benefits for the Limestone Coast economy and that of the whole state.&lt;br&gt;&lt;br&gt;“The State Government is committed to a smart, sustainable and inclusive economic path for increase resilience and competitiveness for our forest industries and is why we were pleased to contribute $2 million of funding towards this new state of the art facility.”&lt;br&gt;&lt;br&gt;The newly commissioned NeXTimber facility is Australia’s only combined CLT and GLT (Cross Laminated and Glue Laminated Timber) radiata pine mass timber facility, and the first in Australia to be integrated with a structural timber manufacturing plant. The NeXTimber facility can produce CLT panels up to 16M long and 3.5M wide, and GLT beams up to 12M long. Mass timber products offer an exciting alternative to traditional construction materials and can help to reduce the embodied carbon of a project. These timber structures can be built up to 12 stories and even taller when combined with other materials in a hybrid timber construction.&lt;br&gt;&lt;br&gt;Timberlink’s $70M capital investment to build a mass timber production facility was announced in 2020, supported by a $2M grant awarded by the SA government under the Strategic Business Round 2020 of the Government of South Australia’s Regional Growth Fund. The NeXTimber brand was announced in 2021 with the tagline “It’s what better tomorrows are built on.” Ground was broken with the first sod turn in Tarpeena in 2022 and construction of the site continued until late 2023. The facility has been taking orders since November 2023, a testament to the hard work of many. The NeXTimber facility has created new jobs not only during the construction phase, but on an ongoing basis with over 30 new full-time positions.&lt;br&gt;&lt;br&gt;Minister Clare Scriven said “South Australia’s forest industries have a long and proud history of sustainably growing and utilising our local resources to address the growing demands for timber, both domestically and internationally.&lt;br&gt;&lt;br&gt;“This new facility at Tarpeena continues that tradition of innovation, both by showcasing some of the world’s best new innovations and supporting greener, secure and modern employment opportunities, all critical ingredients towards ensuring Limestone Coast communities continue to thrive.&lt;br&gt;&lt;br&gt;“This initiative, which the State Government is proud to support, links in with other government commitments to the industry including a $15 million investment towards the establishment of the Forestry Centre of Excellence in Mount Gambier, the $2.346 million upgrade of the South East fire tower network including the installation of ground breaking artificial intelligence based bushfire detection and monitoring system and the $2 million contribution to assist the rollout of projects identified in the South Australian Wood Fibre and Timber Industry Master Plan.&lt;br&gt;&lt;br&gt;“It certainly is an exciting time for the Limestone Coast and South Australian Forest industries as a whole.”&lt;br&gt;&lt;br&gt;Timberlink’s NeXTimber facility development followed their 2019 announcement of a major timber manufacturing upgrade, with over $90M invested over the following 3 years, installing a new saw line, stacker and edger, contraflow kiln and batch kiln and drying building. This project created over 200 jobs in the construction phase.&lt;br&gt;&lt;br&gt;Timberlink Chief Sales, Marketing &amp;amp; Corporate Affairs Officer David Oliver said “This upgrade to the Tarpeena green mill is a testament to Timberlink’s commitment to innovation through timber manufacturing. By increasing the amount of timber that we can process here in the Limestone Coast region, we are directly supporting the local economy and jobs in the region.”&lt;br&gt;&lt;br&gt;Timberlink CEO Paul O’Keefe said “We are well positioned to play our part in supporting the Australian government’s COP28 commitment to increase the use of timber in the built environment by 2030.” &lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=7954825&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fwww.nextimber.com.au%2Fnews-articles%2Fsa-premier-officially-opens-nextimber-facility%2F&amp;amp;bu=https%253A%252F%252Fwww.nextimber.com.au%252Fnews-articles&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Media releases</category>
      <pubDate>Thu, 29 Feb 2024 22:30:00 GMT</pubDate>
      <guid>https://www.nextimber.com.au/news-articles/sa-premier-officially-opens-nextimber-facility/</guid>
      <dc:date>2024-02-29T22:30:00Z</dc:date>
      <dc:creator>NeXTimber</dc:creator>
    </item>
    <item>
      <title>NeXTimber by Timberlink Presses First CLT Panel, Begins Taking Orders</title>
      <link>https://www.nextimber.com.au/news-articles/nextimber-by-timberlink-presses-first-clt-panel-begins-taking-orders/</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/nextimber-by-timberlink-presses-first-clt-panel-begins-taking-orders/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/Blog%20Images/The-first-CLT-panel-pressed-at-the-NeXTimber-facility.jpg" alt="NeXTimber by Timberlink Presses First CLT Panel, Begins Taking Orders" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Timberlink’s NeXTimber facility has pressed its very first Cross Laminated Timber (CLT) panel, marking another significant milestone in the construction of Australia’s only combined CLT and GLT (Cross Laminated and Glue Laminated Timber) radiata pine mass timber facility. The commissioning of this CLT line follows production of the facility’s very first GLT beam in August 2023.&lt;br&gt;&lt;br&gt;David Oliver, Timberlink Chief Marketing, Sales &amp;amp; Corporate Affairs Officer said “The entire team has been working towards this moment since we announced construction of the facility in 2020. To see the hard work of so many come to fruition is very rewarding.”&lt;br&gt;&lt;br&gt;Patrick Dark, Timberlink CLT/GLT Operations Manager, said “There was such an air of positivity when the panel came off the line. Everybody who has been involved in the installation, testing and commissioning of our NeXTimber equipment should be proud of what we’ve accomplished.”&lt;br&gt;&lt;br&gt;The newly commissioned CLT line, co-located at Timberlink’s Tarpeena, SA, manufacturing facility, can produce panels up to 16M long and 3.5M wide and will unlock significant capability to manufacture mass timber building products in Australia. Mass timber products like CLT and GLT offer an exciting alternative to traditional construction materials and can help to reduce the embodied carbon of a project.&lt;br&gt;&lt;br&gt;The NeXTimber by Timberlink team are now accepting orders for CLT and GLT as the facility is scheduled for full production by the end of this month. To learn more visit &lt;a href="https://www.nextimber.com.au"&gt;www.nextimber.com.au&lt;/a&gt;.&lt;br&gt;&lt;br&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/nextimber-by-timberlink-presses-first-clt-panel-begins-taking-orders/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/Blog%20Images/The-first-CLT-panel-pressed-at-the-NeXTimber-facility.jpg" alt="NeXTimber by Timberlink Presses First CLT Panel, Begins Taking Orders" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Timberlink’s NeXTimber facility has pressed its very first Cross Laminated Timber (CLT) panel, marking another significant milestone in the construction of Australia’s only combined CLT and GLT (Cross Laminated and Glue Laminated Timber) radiata pine mass timber facility. The commissioning of this CLT line follows production of the facility’s very first GLT beam in August 2023.&lt;br&gt;&lt;br&gt;David Oliver, Timberlink Chief Marketing, Sales &amp;amp; Corporate Affairs Officer said “The entire team has been working towards this moment since we announced construction of the facility in 2020. To see the hard work of so many come to fruition is very rewarding.”&lt;br&gt;&lt;br&gt;Patrick Dark, Timberlink CLT/GLT Operations Manager, said “There was such an air of positivity when the panel came off the line. Everybody who has been involved in the installation, testing and commissioning of our NeXTimber equipment should be proud of what we’ve accomplished.”&lt;br&gt;&lt;br&gt;The newly commissioned CLT line, co-located at Timberlink’s Tarpeena, SA, manufacturing facility, can produce panels up to 16M long and 3.5M wide and will unlock significant capability to manufacture mass timber building products in Australia. Mass timber products like CLT and GLT offer an exciting alternative to traditional construction materials and can help to reduce the embodied carbon of a project.&lt;br&gt;&lt;br&gt;The NeXTimber by Timberlink team are now accepting orders for CLT and GLT as the facility is scheduled for full production by the end of this month. To learn more visit &lt;a href="https://www.nextimber.com.au"&gt;www.nextimber.com.au&lt;/a&gt;.&lt;br&gt;&lt;br&gt;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=7954825&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fwww.nextimber.com.au%2Fnews-articles%2Fnextimber-by-timberlink-presses-first-clt-panel-begins-taking-orders%2F&amp;amp;bu=https%253A%252F%252Fwww.nextimber.com.au%252Fnews-articles&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Thu, 05 Oct 2023 02:30:00 GMT</pubDate>
      <guid>https://www.nextimber.com.au/news-articles/nextimber-by-timberlink-presses-first-clt-panel-begins-taking-orders/</guid>
      <dc:date>2023-10-05T02:30:00Z</dc:date>
      <dc:creator>NeXTimber</dc:creator>
    </item>
    <item>
      <title>Timberlink manufactures its first GLT beam, meets with the South Australian Parliamentary Select Committee</title>
      <link>https://www.nextimber.com.au/news-articles/timberlinks-first-glt-beam-sa-parliamentary-select-committee/</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/timberlinks-first-glt-beam-sa-parliamentary-select-committee/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/Blog%20Images/Parliamentart-Committee-Compressed.jpg" alt="Timberlink manufactures its first GLT beam, meets with the South Australian Parliamentary Select Committee" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Timberlink was pleased to welcome the South Australian Parliamentary Select Committee to its Tarpeena manufacturing facility this week for the South Australian Forest Products Association’s Seed to Structure tour. In attendance were Hon. Nicola Centofanti MLC, Hon. Tung Ngo MLC, Hon. Frank Pangallo MLC, Hon. Ben Hood MLC, in addition to various industry members from across the South Australian forestry sector.&lt;br&gt;&lt;br&gt;The purpose of the tour was to increase awareness around the many stages of softwood timber manufacturing in South Australia; right from planting seeds in the nursery through to processing and manufacturing finished plantation pine timber products.&lt;br&gt;&lt;br&gt;Ian Tyson, CEO of Timberlink, was delighted to host the committee at Timberlink’s Tarpeena manufacturing facility and to share with them an exciting milestone in the construction of Timberlink’s Cross Laminated Timber (CLT) and Glue Laminated Timber (GLT) manufacturing facility: the very first glue laminated timber beam produced on its newly commissioned GLT line.&lt;br&gt;&lt;br&gt;“This is a very meaningful day for Timberlink,” said Ian Tyson. “From our first sod turn in February 2022 to producing our first GLT beam in August 2023, we are well on our way to full production which is scheduled for October this year. It was fantastic to share this milestone moment with the committee.”&lt;br&gt;&lt;br&gt;Timberlink’s NeXTimber facility will be Australia’s only combined radiata pine CLT and GLT facility, increasing Australia’s sovereign capability to manufacture these products while reducing reliance on imports. Mass timber products offer an exciting alternative to traditional construction materials, with the potential to assist to decarbonise construction in Australia by storing carbon for the life of the timber.&lt;br&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/timberlinks-first-glt-beam-sa-parliamentary-select-committee/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/Blog%20Images/Parliamentart-Committee-Compressed.jpg" alt="Timberlink manufactures its first GLT beam, meets with the South Australian Parliamentary Select Committee" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Timberlink was pleased to welcome the South Australian Parliamentary Select Committee to its Tarpeena manufacturing facility this week for the South Australian Forest Products Association’s Seed to Structure tour. In attendance were Hon. Nicola Centofanti MLC, Hon. Tung Ngo MLC, Hon. Frank Pangallo MLC, Hon. Ben Hood MLC, in addition to various industry members from across the South Australian forestry sector.&lt;br&gt;&lt;br&gt;The purpose of the tour was to increase awareness around the many stages of softwood timber manufacturing in South Australia; right from planting seeds in the nursery through to processing and manufacturing finished plantation pine timber products.&lt;br&gt;&lt;br&gt;Ian Tyson, CEO of Timberlink, was delighted to host the committee at Timberlink’s Tarpeena manufacturing facility and to share with them an exciting milestone in the construction of Timberlink’s Cross Laminated Timber (CLT) and Glue Laminated Timber (GLT) manufacturing facility: the very first glue laminated timber beam produced on its newly commissioned GLT line.&lt;br&gt;&lt;br&gt;“This is a very meaningful day for Timberlink,” said Ian Tyson. “From our first sod turn in February 2022 to producing our first GLT beam in August 2023, we are well on our way to full production which is scheduled for October this year. It was fantastic to share this milestone moment with the committee.”&lt;br&gt;&lt;br&gt;Timberlink’s NeXTimber facility will be Australia’s only combined radiata pine CLT and GLT facility, increasing Australia’s sovereign capability to manufacture these products while reducing reliance on imports. Mass timber products offer an exciting alternative to traditional construction materials, with the potential to assist to decarbonise construction in Australia by storing carbon for the life of the timber.&lt;br&gt;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=7954825&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fwww.nextimber.com.au%2Fnews-articles%2Ftimberlinks-first-glt-beam-sa-parliamentary-select-committee%2F&amp;amp;bu=https%253A%252F%252Fwww.nextimber.com.au%252Fnews-articles&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <pubDate>Fri, 18 Aug 2023 02:30:00 GMT</pubDate>
      <guid>https://www.nextimber.com.au/news-articles/timberlinks-first-glt-beam-sa-parliamentary-select-committee/</guid>
      <dc:date>2023-08-18T02:30:00Z</dc:date>
      <dc:creator>NeXTimber</dc:creator>
    </item>
    <item>
      <title>Recent progress of state-of-the-art NeXTimber® manufacturing facility</title>
      <link>https://www.nextimber.com.au/news-articles/recent-progress-of-state-of-the-art-nextimber-manufacturing-facility/</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/recent-progress-of-state-of-the-art-nextimber-manufacturing-facility/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/Blog%20Images/1-300x216.jpg" alt="Recent progress of state-of-the-art NeXTimber® manufacturing facility" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Timberlink’s EGM Sales, Marketing &amp;amp; Corporate Affairs, David Oliver welcomed newly appointed Deputy Premier Susan Close MP and The Hon. Clare Scriven MLC, Minister for Primary Industries&lt;br&gt;and Regional Development to Timberlink’s Tarpeena mill to see recent progress of the construction of Australia’s first combined Radiata Pine Cross Laminated Timber (CLT) and Glue Laminated Timber (GLT) manufacturing facility which will be co-located at the existing Timberlink Tarpeena site.&lt;br&gt;&lt;br&gt;Having completed the sub ground civils earlier in May, 50% of the concrete at the 15,000 square metre facility has now been poured with production of the NeXTimber range, scheduled to begin in&lt;br&gt;2023.&lt;br&gt;&lt;br&gt;David Oliver, Timberlink’s EGM Sales, Marketing and Corporate Affairs said “It is great to see the interest from the new Government in the exciting development of a world-class timber&lt;br&gt;manufacturing facility at Tarpeena South Australia. It was great to have the opportunity to discuss the NeXTimber Cross Laminated Timber (GLT), Glue Laminated Timber (GLT) facility which is currently under construction at Tarpeena.”&lt;br&gt;&lt;br&gt;Deputy Premier Susan Close MP said “It is wonderful to see the investments being made by Timberlink in both the construction of a new timber manufacturing plant and the inspirational&lt;br&gt;investment in the CLT GLT plant”. “The Forestry Sector in SA employs 18,000 people and is key to the prosperity of Southeast South Australia”&lt;br&gt;&lt;br&gt;The construction the CLT GLT plant is the first combined radiata pine plant in Australia and will create products that will be used to build high rise buildings up to 12 stories. This facility will&lt;br&gt;increase Australia’s sovereign capability to manufacture CLT &amp;amp; GLT and reduce import reliance and assist in decarbonising the Australia construction industry. “Every cubic metre of CLT GLT will store&lt;br&gt;631 KG of carbon and enable the construction of building has store cabin rather than creating more greenhouse gasses,” said Mr Oliver.&lt;br&gt;&lt;br&gt;The Hon. Clare Scriven, Minister for Forest Industries said “I have long been a strong supporter of the Forestry sector and timber manufacturing, The South Australian Government is pleased to be part of this $63M investing in Timberlink’s CLT GLT plant through a co-Investment of $2M”. “I look forward to seeing this world class facility completed and enabling the construction of Carbon Positive buildings in South Australia” said Minister Scriven.&lt;br&gt;&lt;br&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/recent-progress-of-state-of-the-art-nextimber-manufacturing-facility/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/Blog%20Images/1-300x216.jpg" alt="Recent progress of state-of-the-art NeXTimber® manufacturing facility" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Timberlink’s EGM Sales, Marketing &amp;amp; Corporate Affairs, David Oliver welcomed newly appointed Deputy Premier Susan Close MP and The Hon. Clare Scriven MLC, Minister for Primary Industries&lt;br&gt;and Regional Development to Timberlink’s Tarpeena mill to see recent progress of the construction of Australia’s first combined Radiata Pine Cross Laminated Timber (CLT) and Glue Laminated Timber (GLT) manufacturing facility which will be co-located at the existing Timberlink Tarpeena site.&lt;br&gt;&lt;br&gt;Having completed the sub ground civils earlier in May, 50% of the concrete at the 15,000 square metre facility has now been poured with production of the NeXTimber range, scheduled to begin in&lt;br&gt;2023.&lt;br&gt;&lt;br&gt;David Oliver, Timberlink’s EGM Sales, Marketing and Corporate Affairs said “It is great to see the interest from the new Government in the exciting development of a world-class timber&lt;br&gt;manufacturing facility at Tarpeena South Australia. It was great to have the opportunity to discuss the NeXTimber Cross Laminated Timber (GLT), Glue Laminated Timber (GLT) facility which is currently under construction at Tarpeena.”&lt;br&gt;&lt;br&gt;Deputy Premier Susan Close MP said “It is wonderful to see the investments being made by Timberlink in both the construction of a new timber manufacturing plant and the inspirational&lt;br&gt;investment in the CLT GLT plant”. “The Forestry Sector in SA employs 18,000 people and is key to the prosperity of Southeast South Australia”&lt;br&gt;&lt;br&gt;The construction the CLT GLT plant is the first combined radiata pine plant in Australia and will create products that will be used to build high rise buildings up to 12 stories. This facility will&lt;br&gt;increase Australia’s sovereign capability to manufacture CLT &amp;amp; GLT and reduce import reliance and assist in decarbonising the Australia construction industry. “Every cubic metre of CLT GLT will store&lt;br&gt;631 KG of carbon and enable the construction of building has store cabin rather than creating more greenhouse gasses,” said Mr Oliver.&lt;br&gt;&lt;br&gt;The Hon. Clare Scriven, Minister for Forest Industries said “I have long been a strong supporter of the Forestry sector and timber manufacturing, The South Australian Government is pleased to be part of this $63M investing in Timberlink’s CLT GLT plant through a co-Investment of $2M”. “I look forward to seeing this world class facility completed and enabling the construction of Carbon Positive buildings in South Australia” said Minister Scriven.&lt;br&gt;&lt;br&gt;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=7954825&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fwww.nextimber.com.au%2Fnews-articles%2Frecent-progress-of-state-of-the-art-nextimber-manufacturing-facility%2F&amp;amp;bu=https%253A%252F%252Fwww.nextimber.com.au%252Fnews-articles&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Media releases</category>
      <pubDate>Wed, 15 Jun 2022 03:45:00 GMT</pubDate>
      <guid>https://www.nextimber.com.au/news-articles/recent-progress-of-state-of-the-art-nextimber-manufacturing-facility/</guid>
      <dc:date>2022-06-15T03:45:00Z</dc:date>
      <dc:creator>NeXTimber</dc:creator>
    </item>
    <item>
      <title>Timberlink chooses hsbcad software for NeXTimber®</title>
      <link>https://www.nextimber.com.au/news-articles/timberlink-chooses-hsbcad-software-for-nextimber/</link>
      <description>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/timberlink-chooses-hsbcad-software-for-nextimber/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/NeXTimber-Site-Tarpeena-South-Australia.jpg" alt="NeXTimber facility in Tarpeena, South Australia" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Timberlink Australia is delighted to partner with hsbcad, supplying an end-to-end software solution for NeXTimber Cross Laminated Timber (CLT) and Glue Laminated Timber (GLT). hsbcad has been selected following an extensive international review to find the best suite of integrated software tools for project management, digital modelling, manufacturing, and logistics planning of NeXTimber CLT &amp;amp; GLT projects.&lt;br&gt;&lt;br&gt;The decision to partner with hsbcad demonstrates Timberlink’s ongoing commitment to ensuring world leading technology supports every NeXTimber build, production and service aspect. “The bespoke, end-to-end solution we can achieve with hsbcad provides us with an opportunity to optimise our internal and customer facing systems from early engagement in a project, right through to delivery on site,” said Timberlink CEO Ian Tyson. “hsbcad provides both the software and the flexibility to ensure our solution continues to evolve to meet market needs and is unique to our manufacturing process and business model. Integrated through the Autodesk environment, we believe hsbcad places NeXTimber at the forefront of CLT and GLT manufacturing and supply.”&lt;br&gt;&lt;br&gt;Headquartered in Ghent, Belgium, and with 30+ years of industry experience, hsbcad is a global software solution provider for offsite construction. Its extensive software platform can support computer-aided design (CAD), offsite manufacturing, onsite assembly, and compliance with the construction industry’s rapidly emerging Building Information Modelling (BIM) standards.&lt;br&gt;&lt;br&gt;“The combined project experience of Timberlink and hsbcad and the understanding of the market expectation and opportunities in mass timber will help ensure a successful project,” said hsbcad Australasia Managing Director Frank Davern.&lt;br&gt;&lt;br&gt;Mr Tyson added, “We are very pleased to be partnering with hsbcad to implement a premier software solution to support our new customers in the growing and dynamic mass timber construction market”.&lt;br&gt;&lt;br&gt;The NeXTimber CLT and GLT plant is currently being constructed adjacent to Timberlink’s world class timber manufacturing facility in South Australia. Production of the NeXTimber range is scheduled to begin in 2023 with the locally based technical support team ready now to assist customers with planning to use NeXTimber products for future projects.&lt;br&gt;&lt;br&gt;NeXTimber; it’s what better tomorrows are built on.&lt;br&gt;&lt;br&gt;&lt;/p&gt;</description>
      <content:encoded>&lt;div class="hs-featured-image-wrapper"&gt; 
 &lt;a href="https://www.nextimber.com.au/news-articles/timberlink-chooses-hsbcad-software-for-nextimber/" title="" class="hs-featured-image-link"&gt; &lt;img src="https://www.nextimber.com.au/hubfs/NeXTimber/Images/NeXTimber-Site-Tarpeena-South-Australia.jpg" alt="NeXTimber facility in Tarpeena, South Australia" class="hs-featured-image" style="width:auto !important; max-width:50%; float:left; margin:0 15px 15px 0;"&gt; &lt;/a&gt; 
&lt;/div&gt; 
&lt;p&gt;Timberlink Australia is delighted to partner with hsbcad, supplying an end-to-end software solution for NeXTimber Cross Laminated Timber (CLT) and Glue Laminated Timber (GLT). hsbcad has been selected following an extensive international review to find the best suite of integrated software tools for project management, digital modelling, manufacturing, and logistics planning of NeXTimber CLT &amp;amp; GLT projects.&lt;br&gt;&lt;br&gt;The decision to partner with hsbcad demonstrates Timberlink’s ongoing commitment to ensuring world leading technology supports every NeXTimber build, production and service aspect. “The bespoke, end-to-end solution we can achieve with hsbcad provides us with an opportunity to optimise our internal and customer facing systems from early engagement in a project, right through to delivery on site,” said Timberlink CEO Ian Tyson. “hsbcad provides both the software and the flexibility to ensure our solution continues to evolve to meet market needs and is unique to our manufacturing process and business model. Integrated through the Autodesk environment, we believe hsbcad places NeXTimber at the forefront of CLT and GLT manufacturing and supply.”&lt;br&gt;&lt;br&gt;Headquartered in Ghent, Belgium, and with 30+ years of industry experience, hsbcad is a global software solution provider for offsite construction. Its extensive software platform can support computer-aided design (CAD), offsite manufacturing, onsite assembly, and compliance with the construction industry’s rapidly emerging Building Information Modelling (BIM) standards.&lt;br&gt;&lt;br&gt;“The combined project experience of Timberlink and hsbcad and the understanding of the market expectation and opportunities in mass timber will help ensure a successful project,” said hsbcad Australasia Managing Director Frank Davern.&lt;br&gt;&lt;br&gt;Mr Tyson added, “We are very pleased to be partnering with hsbcad to implement a premier software solution to support our new customers in the growing and dynamic mass timber construction market”.&lt;br&gt;&lt;br&gt;The NeXTimber CLT and GLT plant is currently being constructed adjacent to Timberlink’s world class timber manufacturing facility in South Australia. Production of the NeXTimber range is scheduled to begin in 2023 with the locally based technical support team ready now to assist customers with planning to use NeXTimber products for future projects.&lt;br&gt;&lt;br&gt;NeXTimber; it’s what better tomorrows are built on.&lt;br&gt;&lt;br&gt;&lt;/p&gt;  
&lt;img src="https://track.hubspot.com/__ptq.gif?a=7954825&amp;amp;k=14&amp;amp;r=https%3A%2F%2Fwww.nextimber.com.au%2Fnews-articles%2Ftimberlink-chooses-hsbcad-software-for-nextimber%2F&amp;amp;bu=https%253A%252F%252Fwww.nextimber.com.au%252Fnews-articles&amp;amp;bvt=rss" alt="" width="1" height="1" style="min-height:1px!important;width:1px!important;border-width:0!important;margin-top:0!important;margin-bottom:0!important;margin-right:0!important;margin-left:0!important;padding-top:0!important;padding-bottom:0!important;padding-right:0!important;padding-left:0!important; "&gt;</content:encoded>
      <category>Media releases</category>
      <pubDate>Thu, 03 Feb 2022 23:15:00 GMT</pubDate>
      <guid>https://www.nextimber.com.au/news-articles/timberlink-chooses-hsbcad-software-for-nextimber/</guid>
      <dc:date>2022-02-03T23:15:00Z</dc:date>
      <dc:creator>NeXTimber</dc:creator>
    </item>
  </channel>
</rss>
