Case Study: Tonsley Technical College

Responding to a request to investigate different options for a mass timber structure, NeXTimber worked alongside project stakeholders to provide a CLT solution for this specialist education institution in South Australia.

 

Image credit: Sarah Constructions

LOCATION
Tonsley, SA
CLIENT
Sarah Constructions / Build
SUB-CONTRACTOR
Standstruct
ARCHITECT
Das Studio
ENGINEER
Innovis

NeXTimber brings engineered timber to the heart of innovation

At the Tonsley Innovation District in Adelaide, the Factory of the Future education centre is setting the stage for how Australia will train the workforce of tomorrow. It brings together Flinders University, Tonsley Technical College and industry partners to deliver hands-on training in construction, advanced manufacturing, engineering and energy. From the earliest stages, Timberlink’s NeXTimber team was engaged to support the project’s goal of using locally made CLT.

Interior of Tonsley Technical College with exposed CLT ceiling

FROM CONCEPT TO CONSTRUCTION

In late 2022, project architect Das Studio approached us to explore how CLT could help meet their sustainability and prefabrication goals. Over the course of the next 18 months, our team worked collaboratively with Das Studio and engineers from Innovis to provide technical support, consultation on manufacturing and buildability of CLT elements as well as costing advice for the client through the design iterations. 

 When Sarah Constructions joined as the main contractor, the NeXTimber team played a key supporting role to their project delivery team to assist with the detailed mass timber solution alongside other timber and specialist subcontractors such as Standstruct.

PRECISION MEETS PERFORMANCE

For this project, NeXTimber was selected as the supplier of CLT for floor and roof elements. We manufactured and delivered nearly 200 CLT panels for floor and roof elements – some as large as 37 square metres and weighing up to 5 tonnes. All panels were produced at our Tarpeena facility using radiata pine from responsibly managed plantations in the Green Triangle, the forestry region spanning southeast South Australia and southwest Victoria.

We produced manufacturing and logistics documentation, based on the technical design provided by the engineering and architectural teams. This included 3D manufacturing models, shop drawings, and coordination with supply partners to manage delivery and installation sequencing. In total, we delivered 22 truckloads of precision-cut panels, each arriving on site in the exact order required by the customer for efficient installation.

Tonsley Technical College under construction, showing its timber frame
CLT roof panels and timber columns over the open upper floor at Tonsley during construction

NAVIGATING COMPLEXITY

Large panel sizes, tight timelines and the high-profile nature of the site made planning and coordination critical. We developed a tailored logistics solution with our transport partners to get multiple oversized trucks to site daily, safely and on time.

A BLUEPRINT FOR WHAT'S NEXT

This project showed what’s possible when design ambition meets technical know-how. By working together across architecture, engineering and construction, we delivered more than just timber – we helped bring a bold educational vision to life. The result is a landmark facility built with Australian grown and manufactured CLT and designed to inspire future makers, builders and innovators.

"This project is an outstanding example of South Australian organisations working together to deliver an innovative, sustainable, high-quality project with far-reaching, long-term employment opportunities for South Australians and the future of the local construction industry." 
Adrian EsplinChief Executive Officer - Sarah Constructions
"Engaging with NeXTimber by Timberlink early on was critical to the success of the CLT on this project. Their experienced team supported us every step of the way - from design and cost input through to installation and follow-on works. As we were new to using this product and system, having a supplier who not only understood their product but also its integration with other building works, such as services, fixings, and fire rating, was invaluable. Timberlink was acommodating of changes along the way and their support made a real difference to the outcome."
Hanan JamalProject Manager - Sarah Constructions