Skip to content
Glue laminated timber columns in the reception of Limestone Coast Technical College

Case Study: Limestone Coast Technical College

A complex educational facility brought to life with locally manufactured NeXTimber® CLT and GLT.
LOCATION
Mount Gambier, South Australia
BUILDER
Kennett Builders
ARCHITECT
Russell & Yelland
ENGINEER
Aurecon
SPECIALIST SUBCONTRACTOR
Standstruct 

BACKGROUND

Emerging from Mount Gambier’s distinct landscape, the Limestone Coast Technical College represents an innovative step forward for South Australia’s educational infrastructure. Commissioned by the Department for Education, this pioneering facility offers hands-on training for senior students in agri-tech, early childhood and education, health, social support and multi-trades.

This forward-thinking, environmentally driven curriculum is mindfully reflected in the structure’s localised identity. “The design team’s site visit to Mount Gambier inspired the building’s form and materiality,” Hariklia Pontikinas, Associate with Russell & Yelland, notes. A tour of a local quarry cemented limestone – one of the project’s foundational materials – as inspiration for the building’s angular, raking form, expressed in a palette of earthy browns and vibrant blues that evoke the region’s iconic Blue Lake and many sinkholes.

 

To complement the local stone and reinforce the structure’s environmental profile, the architects engaged Timberlink to supply NeXTimber CLT and GLT, manufactured locally from responsibly managed Australian plantation pine that is Responsible Wood and Forest Stewardship Council® (FSC) certified. “With nearly a zero-carbon footprint, timber is a more sustainable option,” Hariklia explains, “and using locally sourced materials like CLT and GLT also reduces the carbon footprint of transport.” Beyond its sustainability profile, the exposed timber framework imbues the educational environment with warmth and a sense of calm, while offering students an immersive learning experience in a space that showcases diverse construction methods.
Glue laminated timber columns in the reception of Limestone Coast Technical College

CHALLENGE

Bringing this visionary structure to life came with a set of unique challenges. Along with the complex geometry of the layouts, housing education and accommodation within one structure meant addressing a mix of acoustic, fire and structural requirements – and all of this played out on a restricted site, hemmed in by an occupied building on one side and a public road on the other.

As Chris Wood, Director of Standstruct, the specialist subcontractor engaged to install the NeXTimber CLT and fabricate the GLT elements, explains, the angular structure pushed the limits of timber fabrication. “The geometry and the layouts were very tricky, especially around the K-brace arrangements,” he notes, emphasising that getting these robust connections right and ensuring the precise char depth required for fire safety was a rigorous process.

The project team had to navigate the strict regulatory demands and distinct complexities of each building use type: while the ground floor houses educational spaces, the upper floor also features residential student dormitories, designated as an isolated fire zone.

This upper level imposed stringent requirements for acoustic separation between the dormitory floor above and the spaces below, as well as strict compartmentation rules: any services penetrating the mass timber had to maintain rigorous Fire Resistance Levels (FRLs).

And while conventional concrete relies on tried-and-tested methods like fire collars cast into the slab, Emil Norup, Design Manager with Kennett Builders, explains that timber is unique – fire protection has to be applied to the underside after the fact, making it more visible. With each dormitory bathroom requiring several penetrations through the slab, coordinating these visible, tested systems to align with the project’s aesthetic intent became a key challenge.

Limestone Coast Technical College under construction with exposed GLT beams and CLT roofs and floors
Glulam beams in the cafeteria at Limestone Coast Technical College
NeXTimber's visible presence now plays an integral role in students' learning experience.

SOLUTION

To address these challenges and integrate NeXTimber’s mass timber solutions – which formed the suspended first-floor CLT slab, the CLT roof slab and, effectively, half of the building’s vertical structure — the project team prioritised early engagement and profound collaboration.

“Designing a building with these systems took a lot of collaboration with consultants and NeXTimber, in the early design phases to understand the parameters of the mass timber,” Hariklia notes. “This meant a huge amount of coordination before construction, down to bolt locations and services penetrations.”

This collaborative process led the team to NeXTimber’s factory floor to discuss design solutions and witness the manufacturing process in person, and both Standstruct and Kennett were engaged remarkably early. This approach, Chris stresses, allows teams to resolve any buildability issues before they become bottlenecks. “Collaboration from the start is the only way these timber buildings really work,” he says. This project is an excellent example of this ethos.

NeXTimber supplied the CLT panels for swift installation, alongside commodity-length GLT blanks, which Standstruct’s manufacturing partners block-glued and fabricated into the massive sections  required for the structure. Working alongside structural engineers and NeXTimber’s manufacturing team, Standstruct resolved the complexity of the large K-brace connections through rigorous  modelling and an iterative, collaborative problem-solving process. This approach was also vital when tackling the building’s acoustic and fire regulations. As  Hariklia notes, the design team, consultants and builder “worked through numerous iterations of solutions to find an outcome that was structurally acceptable and feasible for construction.” The accommodation suites were designed as a separate fire compartment, meeting the relevant fire and acoustic requirements.

To maintain acoustic separation between the dormitory floor above and the spaces below, Emil explains, the team added “acoustic resilient mount systems on top of the timber slab with insulation and heavy CFC sheets.” This floor build-up was designed to match the system tested to Australian Standards to meet the acoustic requirements, and the appropriate amount of absorbent material required to meet the Department for Education acoustic requirements was applied directly to the timber to mitigate its inherent acoustic reflections.

And because the services were ultimately left exposed against the finished timber underside rather than reticulated through the slab’s cavity, coordination became even more critical to preserve the project’s aesthetic intent. The team successfully leveraged early 3D modelling, allowing NeXTimber to capture and incorporate all penetration locations in the beams, first-floor slabs and roof elements during fabrication, before the materials arrived on site.

Mass timber, Emil says, “worked beautifully.” “NeXTimber were great in accommodating that,” Emil adds, hailing it as a substantial win for the project’s buildability. This manufacturing precision meant all the holes lined up perfectly with the services that needed to run through, eliminating the need for expensive on-site set-out and coring. “Coring 60-70mm holes through a 450mm beam is very time-consuming and costly.”

Logistically, relying on a localised NeXTimber manufacturing plant also paid other dividends. “Timely arrival of materials and sequencing adjustments achievable with the short travel distance allowed seamless progress on site without the need for 3rd party storage and logistics, including the inherent risks and costs associated,” Emil says.

The result? A swift construction phase. “The speed at which the superstructure was erected was impressive,” Emil notes, highlighting NeXTimber’s coordination and versatility as essential
to meeting the ambitious construction timeline. “Shortly after ground-floor concrete was placed, where CLT and GLT were used, the entirety of the structure was erected much more quickly than
traditional construction techniques.”

For Chris, this ambitious project also proves the material’s sheer structural capability. “The project’s complex fabrication really speaks to mass timber’s capability on complex structural builds,” he reflects, while Emil adds that working through the project’s complexities for a locally sourced and sustainable product brought on an abundant sense of pride and teamwork for Kennett.

Hariklia echoes that sentiment, highlighting the importance of partnering with manufacturers like NeXTimber by Timberlink in Russell & Yelland’s first foray into mass timber. “It was a big
learning opportunity,” she says, “and a great opportunity to work with a local manufacturer, use locally sourced materials and embrace a more sustainable construction approach.”

For Timberlink, an active employment partner for the college’s multi-trade and agri-tech segments, this project represents an inspiring full-circle moment. Beyond supporting local students by hosting site tours, providing work experience opportunities and creating potential pathways to future employment for graduates, NeXTimber’s visible presence now plays an integral role in students’ learning experience.

Show more
Exposed CLT roof at Limestone Coast Technical College
Tall glulam beams and columns in a classroom at Limestone Coast Technical College
Mount Gambier Technical College

Discuss Your Project

Planning a project with mass timber? Talk to the NeXTimber team about your project requirements and how our CLT and GLT solutions could support your design and delivery.