Case Study: Lighthorse Business Hub 2.0
Eastern Creek, NSW
THE BRIEF
NeXTimber® was given the opportunity to support Savcon on the supply of the second structure of this type on the site. The mass timber structure utilised a combination of CLT from NeXTimber, glulam beams and columns from Australian Sustainable Hardwoods (ASH) and external glulam elements from Hyne.
The project was scheduled for delivery on site in the early ramp-up period of NeXTimber’s factory, requiring NeXTimber to work closely with Savcon to provide as much data and information as possible early in the process so their team could make an informed decision on proceeding with the supply of NeXTimber CLT for the floor, wall and roof panels.

THE PROCESS
As the design and construct sub-contractor to the main builder for the mass timber super structure, Savcon engaged NeXTimber® directly to coordinate with their design team and other suppliers including ASH, Hyne and Rothoblaas to deliver the mass timber building solution for the head contractor, requiring a high degree of detailed coordination.

CHALLENGES & SOLUTIONS
Although this was the second structure of the same typology on the site, there were several improvements that the client team wished to incorporate into the design, which required careful coordination in the modelling and approvals process, including modifications to the CLT lift core, penetrations and trimming to the floor panels to allow continuous columns and facade detailing and installation of large format CLT floor panels.